Green Lane, Swineshead, Bedford, MK44

Guide Price
£385,000
SSTC
This property listing is now SSTC

3 Bedroom Semi-Detached House for sale in Bedford

1 3 1
  • Outstanding opportunity to update, extend and improve.
  • (Subject to planning permission and building regulation approval).
  • Established semi-detached home occupying a generous, mature plot.
  • Currently offers around 1,200 square feet of versatile accommodation with 2/3 double bedrooms.
  • Established gardens and ample off-road parking.
  • Delightful semi-rural location yet ideally positioned for access to Kimbolton. Bedford and major road and rail links.

Situated in the charming village of Swineshead, this delightful semi-detached house presents a fantastic opportunity to own a versatile family home set within a generous, mature plot. Offering approximately 1,200 square feet of accommodation, the property currently features 2 to 3 double bedrooms, a comfortable reception room, and a well-proportioned bathroom, providing ample space for both relaxing and entertaining.

Upon entering, you will appreciate the spacious and light-filled living area that lends itself perfectly to family gatherings or quiet evenings. The adaptable layout allows for the option to configure rooms to suit your lifestyle, whether that means using one of the rooms as a home office, playroom, or additional bedroom. This flexibility is complemented by the potential to modernise, extend, and improve the house further, subject to planning permission and building regulation approval, making it an outstanding opportunity for buyers looking to create their dream home.

Outside, the property boasts established gardens that are both private and well-maintained, offering a tranquil setting for outdoor enjoyment. Whether you have a passion for gardening or simply enjoy spending time outdoors, the generous garden space provides a wonderful backdrop for summer barbecues, family games, or peaceful relaxation. Additionally, the ample off-road parking caters ideally to households with multiple vehicles or visiting guests, adding a practical edge to the home’s appeal.

One of the standout features of this property is its enviable location. Nestled in a delightful semi-rural setting, you can enjoy the peace and quiet of countryside living while remaining conveniently positioned for access to nearby Kimbolton, Bedford, and excellent major road and rail links. This makes commuting or weekend travel straightforward, combining the best of rural charm with urban accessibility.Entrance Hall

Kitchen
3.70m x 3.70m (12' 2" x 12' 2")

Reception Room/Bedroom Three
3.90m x 3.70m (12' 10" x 12' 2")

Study
2.90m x 2.50m (9' 6" x 8' 2")

Bathroom

Office
3.30m x 1.80m (10' 10" x 5' 11")

Workshop and Coal shed

First Floor Landing

Loft Area

Bedroom One
3.10m plus eaves space x 3.00m (10' 2" x 9' 10")

Bedroom Two
4.50m x 4.00m maximum (14' 9" x 13' 1")

Location.
Swineshead is a quiet village of about 60 homes in North Bedfordshire, near to the borders with Cambridgeshire and Northamptonshire. It enjoys a delightful mix of properties, many of which are timber-framed with several dating from the C16th.
The C14th Church of St Nicholas, with its beautiful, recessed, Jurassic limestone spire is rare for remaining open to visitors throughout the day.
Surrounded by a delightful rural landscape, a short cycle ride or walk will take you to the larger village of Riseley, with its C19th pub, famed for its good food and beer, its shop and its popular school. Sharnbrook Academy and Sixth Form is a little further on, along with community sports centre, surgery and theatre, while the County town of Bedford, with its world-renowned Harpur Trust private schools and fast trains to London is just a twenty-minute drive or bus journey away.
There is currently a bus service four times a day through Swineshead that travels between Bedford and Kimbolton.

BUYERS INFORMATION
To comply with government Money Laundering Regulations 2019, we are required to confirm the identity of all prospective buyers at the point of agreeing a sale. We use the services of a third party and there is a nominal charge for this service. Please note that we are unable to issue a Memorandum of Agreed Sale until the checks are complete.

Important Information

  • This is a Freehold property.

Property Ref: 29662163

Share:

Similar Properties

Church Brothers Close, Brington, Huntingdon, PE28

3 Bedroom Semi-Detached House | Guide Price £375,000

Fine three bed semi with en suite, situated on a small scheme of just 8 homes and recently improved, refreshed and upgra...

Keysoe Row West, Keysoe, Bedford, MK44

2 Bedroom Detached House | Offers Over £350,000

This charming country cottage is perfectly located within this delightful rural landscape. The property has been extende...

High Street, Upper Dean, PE28

3 Bedroom Terraced House | Guide Price £350,000

Fine, established semi-detached home, remodelled and considerably improved, with exceptional gardens backing onto fields...

Cedar Close, Grafham, Huntingdon, PE28

3 Bedroom Semi-Detached House | Guide Price £400,000

This extended, improved, refreshed and upgraded semi-detached home offers the perfect environment for both young and gro...

Littlecotes Close, Spaldwick, Huntingdon, PE28

4 Bedroom Detached House | Guide Price £400,000

Fine family home with around 1,150 square feet of comfortable accommodation and generous gardens, perfectly situated in...

Catworth Farm Lane, Catworth, Huntingdon, PE28

4 Bedroom Detached House | £410,000

Being Sold via Secure Sale online bidding. Terms and conditions apply. Starting Bid £410,000. Closing Date 24/06/2026 at...

Peter Lane & Partners (Kimbolton)

Kimbolton, Cambridgeshire, PE28 0HA

01480 860400

How much is your home worth?

Use our short form to request a valuation of your property.

Request a Valuation

Mortgage Calculator

Amount Borrowed: £
Total Amount Repayable: £
Total Monthly Payment: £
©2026 The Guild of Property Professionals. All rights reserved. Terms and Conditions | Privacy Policy | Cookie Policy | Complaints Policy | Members Login
The Guild of Property Professionals Trading Address: 121 Park Lane, London W1K 7AG. GPEA Limited. Registered in England & Wales.  Company No: 02819824.  Registered Office Address: The Old Courthouse, 60A London Road, Grantham, NG31 6HR.  VAT Registration No: 180897859
Book a Property Valuation Update Cookies Preferences