Cherry Tree Way, Ampthill, Bedfordshire, MK45

£255,000

2 Bedroom Terraced House for sale in Bedfordshire

1 2 1
  • Sought after cul-de-sac position within Ampthill
  • Kitchen
  • Generous bay fronted living room
  • Main bedroom with built in shelved and railed wardrobe
  • Good size second bedroom
  • White three piece suite bathroom
  • Redecorated & new contemporary window blinds and carpets fitted throughout
  • Allocated parking space

A quite superb, stylish two bedroom cluster home nestled within an attractive cul-de-sac on the fringes of the picturesque Georgian market town of Ampthill and providing the perfect opportunity for a first time/investment purchase.

Approach to the property is via a hard standing path, flanked to either side by grass lawn. A upvc double glazed front door provides entry directly into the entrance hall. This has been laid with a tiled floor and has two useful storage cupboards, one which houses the boiler and the other ideal for tucking away the hoover and ironing board. To the right hand side the kitchen has been fitted with a comprehensive range of floor and wall mounted units with complementary darker work surfaces over. Several appliances have been cleverly woven into the design including a free standing cooker, extractor hood, washing machine and upright fridge/freezer. Modern splashback tiling adorn the walls. Moving the other side of the hallway is the living room which is of good proportions and has a dog leg staircase leading to the first floor. A box bay window to the front elevation floods the space with an abundance of natural daylight.

Upstairs the first floor landing gives way to all the accommodation, the master of which sits to one side and has the benefit of a double, shelved and railed wardrobe, whilst to the opposite side the second bedroom is still a generous single room. Both are serviced by a family bathroom which comprises of a panelled bath with shower unit positioned over, low level wc and a wash hand basin. An obscure glazed window finishes the look.

Externally an allocated parking space is positioned behind the property.

Within a short distance from the home are access to Ampthill town centre with extensive amenities, parks and local Waitrose store. The area is renowned for its autonomous schooling for all age groups. There is also a local pick up point for the Bedford Harpur trust private schools for both boys and girls. Links into London are from the Flitwick platform with a frequent service into St Pancras which takes as little as 40 minutes.

Important Information

  • This is a Freehold property.

Property Ref: 86734211_AMP230253

Share:

Similar Properties

Montgomery Close, Stewartby, Bedford, Bedfordshire, MK43

3 Bedroom Terraced House | £250,000

A traditional three bedroom mid-terrace property available chain free, overlooking an open green and a secluded situatio...

Bedford Street, Ampthill, Bedfordshire, MK45

2 Bedroom Apartment | £245,000

A quite superb two bedroom, first floor apartment set within the heart of the historic Georgian market town of Ampthill...

The Hawthorns, Flitwick

2 Bedroom Flat | Asking Price £230,000

Larger than average two bedroom first floor apartment in a beautiful gated development. Offering considerably more space...

Cherry Close, Houghton Conquest, Bedfordshire, MK45

3 Bedroom Semi-Detached House | Guide Price £260,000

*CASH BUYERS ONLY BEING SOUGHT* Available to acquire with no chain and vacant possession is a three-bedroom semi-detache...

Arundel Road, Marston Moretaine, Bedfordshire, MK43

2 Bedroom End of Terrace House | Offers Over £270,000

Constructed approximately 30 years ago and situated within this established village development and cul-de-sac position...

Montgomery Close, Stewartby, Bedfordshire, MK43

3 Bedroom Terraced House | £275,000

A rarely available and deceptively spacious three-bedroom terraced home occupying a delightful village position.Approach...

Urban & Rural (Flitwick)

Flitwick, Bedfordshire, MK45 1DS

01525 530022

How much is your home worth?

Use our short form to request a valuation of your property.

Request a Valuation

Mortgage Calculator

Amount Borrowed: £
Total Amount Repayable: £
Total Monthly Payment: £
©2026 The Guild of Property Professionals. All rights reserved. Terms and Conditions | Privacy Policy | Cookie Policy | Complaints Policy | Members Login
The Guild of Property Professionals Trading Address: 121 Park Lane, London W1K 7AG. GPEA Limited. Registered in England & Wales.  Company No: 02819824.  Registered Office Address: The Old Courthouse, 60A London Road, Grantham, NG31 6HR.  VAT Registration No: 180897859
Book a Property Valuation Update Cookies Preferences