Site 508 Enler Village

Fixed Price
£235,000
SSTC
This property listing is now SSTC

3 Bedroom Town House for sale in Comber

1 3 2
  • Luxury Turnkey Specification - Hagan Homes is renowned for its heritage of craftsmanship and reputation for carefully applying the best of modern building technology to every development.
  • The result is a place that is rich in detail, with homes that are stylish, efficient and comfortable.
  • GENERAL FEATURES
  • Gas high efficiency boiler with thermostatically controlled radiators
  • Internal doors: White panel doors with chrome handles
  • Extensive electrical specification to include pre-wire for BT, Sky+ and Virgin Media with Ultrafast broadband speeds of up to 1000 Mps available
  • Internal walls, ceilings and woodwork painted in neutral colours
  • Tiled hallway
  • Carpets to lounge, stairs landing and bedrooms
  • Decorative fire to be fitted

Homes designed and built with you in mind

Steeped in history, Comber is renowned as the home of the designer of the Titanic, Thomas Andrews, was famous for its whiskey distillery, linen mills, war heroes and even as the birthplace of a Northern Irish Prime Minister. In the 1930's it was a venue for the famous TT motor race and today is a bustling modern town with a charming and friendly atmosphere.

Enler Village is located off the Newtownards Road, just minutes from Comber town centre and the abundance of amenities, facilities and activities available there. For such a small town Comber has a lot to offer its residents, and it embodies a truly inclusive community atmosphere.

At Hagan Homes
we are not developers;

We are home builders.

With over 30 years experience Hagan Homes prides itself on offering affordable, quality, stylish homes, so go ahead and make your new home a Hagan Home.

Convenient living witheverything on your doorstep

- Unbeatable location with a number of primary and secondary schools all within a close distance.
- A brief 3 minute walk to the bus stop providing easy access to Comber town centre, Newtownards, Dundonald and beyond.
- Easy reach distance to Comber Town with an array of nearby shops, local eateries and host to Comber Farmers Market.
- A short 10 minute stroll to the nearest convenience store.
- Located less than 4 miles away from areas of natural beauty such as the Castle Espie Wetland Centre and Scrabo Tower.
- A short cycle distance away from the Comber Greenway a 7-mile traffic-free section of the National Cycle Network that runs along the old Belfast - Comber railway line.

All on your doorstep (Travel times by car)

Comber Leisure Centre - 5 minutes
Tesco Express - 4 minutes
Comber Rec. Football Club - 3 minutes
SuperValu - 5 minutes
Newtownards Town Centre - 7 minutes
The Garage / Texaco Filling Station - 4 minutes
Castle Espi

Entrance Hall: - () -

Lounge: - (5.21m x 4.19m) ((17'1" x 13'9")) -

Kitchen/Dining: - (5.21m x 3.40m) ((17'1" x 11'2")) -

Separate Wc: - (1.96m x 0.99m) ((6'5" x 3'3")) -

Bedroom (1): - (4.19m x 3.43m) ((13'9" x 11'3")) -

Ensuite: - (2.64m x 0.99m) ((8'8" x 3'3")) -

Bedroom (2): - (4.34m x 3.40m) ((14'3" x 11'2")) -

Bedroom (3): - (3.07m x 3.00m) ((10'1" x 9'10")) -

Bathroom: - (2.24m x 2.08m) ((7'4" x 6'10")) -

Property Ref: 34230151

Share:

Similar Properties

Site 495 Enler Village

3 Bedroom Semi-Detached House | Fixed Price £235,000

Homes designed and built with you in mindSteeped in history, Comber is renowned as the home of the designer of the Titan...

Site 495 Enler Village

3 Bedroom Semi-Detached House | Fixed Price £232,000

Homes designed and built with you in mindSteeped in history, Comber is renowned as the home of the designer of the Titan...

Site 504 Enler Village

3 Bedroom Town House | Fixed Price £230,000

Homes designed and built with you in mindSteeped in history, Comber is renowned as the home of the designer of the Titan...

Site 495 Enler Village

3 Bedroom Semi-Detached House | Fixed Price £236,000

Homes designed and built with you in mindSteeped in history, Comber is renowned as the home of the designer of the Titan...

Site 508 Enler Village

3 Bedroom Town House | Fixed Price £237,000

Homes designed and built with you in mindSteeped in history, Comber is renowned as the home of the designer of the Titan...

Site 495 Enler Village

3 Bedroom Semi-Detached House | Fixed Price £237,000

Homes designed and built with you in mindSteeped in history, Comber is renowned as the home of the designer of the Titan...

John Minnis Estate Agents (Comber)

Comber, County Down, BT23 5DU

028 9187 1212

How much is your home worth?

Use our short form to request a valuation of your property.

Request a Valuation

Mortgage Calculator

Amount Borrowed: £
Total Amount Repayable: £
Total Monthly Payment: £
©2026 The Guild of Property Professionals. All rights reserved. Terms and Conditions | Privacy Policy | Cookie Policy | Complaints Policy | Members Login
The Guild of Property Professionals Trading Address: 121 Park Lane, London W1K 7AG. GPEA Limited. Registered in England & Wales.  Company No: 02819824.  Registered Office Address: 2 St. Stephen's Court, St. Stephen's Road, Bournemouth, Dorset, England, BH2 6LA.  VAT Registration No: 576 8795 61
Book a Property Valuation Update Cookies Preferences