Churchmans House, Portman Road, Ipswich, Suffolk

Guide Price
£180,000

2 Bedroom Apartment for sale in Ipswich

2 1
  • NO ONWARD CHAIN
  • LOFT STYLE LIVING
  • 2 BEDROOMS PLUS MEZZANINE AREA
  • OPEN PLAN LIVING/KITCHEN/DINING
  • HOT TUB INCLUDED
  • FURNITURE & FURNISHINGS AVAILABLE BY SEP. NEG
  • DOUBLE GLAZED & GAS CENTRAL HEATING
  • ALLOCATED PARKING SPACE
  • NEXT TO IPSWICH TOWN FOOTBALL CLUB
  • WALKING DISTANCE TO RAILWAY STAITION T/C AND WATERFRONT

NO ONWARD CHAIN - Loft style living in the heart of Ipswich, this 2 bedroom 2nd floor apartment is currently being used as a very successful Air BNB which the current owner has benefited from after originally living in the apartment for many years. Located just a few minutes walk from Ipswich main line railway station, a short walk to Ipswich Town centre and vibrant waterfront with its bars and restaurants, next door to Ipswich Town Football Club for the sport enthusiast taking in the atmosphere at home matches. The apartment can be accessed via a staircase or lift, upon entering into a curved hall leading to 3 bedrooms, bathroom and open plan kitchen/dining/living, steps up to mezzanine area providing another sleeping area, 2 sets of double doors out to a South facing balcony with hot tub & 2 patio heaters, allocated parking space which is like gold dust in these area's. 

COMMUNAL ENTRANCE With stairs and lift access to the apartment, rear doors to carpark. 

ENTRANCE HALL Door leading to entrance hall with oak flooring, slim line radiator, door access to hot water cylinder, doors to bathroom, bedrooms and open plan living/kitchen/dining room. 

LIVING/KITCHEN/DINING 28' 3" x 12' 8" (8.61m x 3.86m) Oak flooring, double glazed window to front aspect, school style radiator, 2 sets of double doors leading out to the balcony, oak fitted eye level and matching base units with granite work tops, matching island with storage drawers and wine rack, Beaumatic 5 ring gas gas cooker with stainless steel splash back and extractor, Beaumatic integrated dish washer, inset stainless steel sink with swan neck mixer tap, space for fridge/freezer, steps up to mezzanine area. 

MEZZANINE AREA 24' 6" max x 12' 10" max (7.47m x 3.91m) Steps leading to mezzanine area which provides and extra sleeping area, double door deep built in storage cupboard a further double door storge one with plumbing for washing machine. 

BALCONY 28' 3" x 12' 3" (8.61m x 3.73m) South facing balcony with timber decking for flooring, outside lighting, hot tub and 2 patio heaters to remain as part of the sale, tree top views up to Ipswich railway station. 

BEDROOM 1 12' 1" x 7' 10" (3.68m x 2.39m) Oak flooring, double glazed window to front aspect, radiator, wall mounted air conditioning unit, 2 door built in wardrobe with storge over. 

BEDROOM 2 12' 1" x 5' 10" (3.68m x 1.78m) Oak flooring, double glazed window to front aspect, slim line wall radiator. 

BATHROOM Comprising low level WC, wash hand basin, bath with mixer shower attachment, shower cubicle, extractor fan, chrome heated towel rail, tiled flooring, curved feature glass block wall. 

OUTSIDE Main front door with access code into communal entry hall with stairs to apartments and lift for access to apartment, rear communal door leads carparking area parking space No137 is allocated to the apartment, remote controlled or code assisted gate for access and leaving. 

COUNCIL TAX Council Tax Band (D) £2,358.54 

SERVICES we understand all mains services are connected. 

NEAREST SCHOOLS Hillside primary school, Stoke High school Ormiston Academy.  

LEASE DETAILS 125 lease with 100 years remaining.
Service charge £2,467.52 charge includes building insurance, communal cleaning and lift maintenance.
Ground rent £800.00 PA 

AGENTS NOTE: The vendors will consider selling the furniture and furnishings by separate negotiation, please contact us to discuss this further. 

DIGITAL MARKETS, COMPETITION AND CONSUMER ACT 2024 (DMCC)
Your Ipswich Ltd has not tested any electrical items, appliances, plumbing or heating systems and therefore cannot testify that they are operational. These particulars are set out as a general outline only for the guidance of potential purchasers or tenants and do not constitute an offer or contract. Photographs are not necessarily comprehensive or current and all descriptions, dimensions, references to condition necessary permissions for use and occupation and other details are given in good faith and believed to be correct but should not be relied upon as statements of, or representations of, fact. Intending purchasers or tenants must satisfy themselves by inspection or otherwise as to the correctness of each of them. We have taken steps to comply with the Digital Markets, Competition and Consumer Act 2024 (DMCC), which require both the seller and their agent to disclose anything, within their knowledge, that would affect the buying decision of the average consumer. If there are any aspects of this property that you wish to clarify before arranging an appointment to view or considering an offer to purchase, please contact us and we will make every effort to be of assistance.

Your Ipswich Ltd, as part of their service to both vendor and purchaser, offer assistance to arrange mortgage and insurance policies, legal services, energy performance certificates, and the valuation and sale of any property relating to any purchaser connected to this transaction. Your Ipswich Ltd confirms they will not prefer one purchaser above another solely because he/she has agreed to accept the offer of any other service from Your Ipswich Ltd. Referral commission (where received) is in the range of £60 to £200.
 

AGENT’S STAMP DUTY NOTE
Please be advised that as of the 1st of April 2025, the government is changing the stamp duty and land tax structure on all residential purchases, which may affect the cost of stamp duty and land tax for your property purchase.
As of the 1st of April 2025, stamp duty and land tax will become due on all residential purchases of £125,000 or more. First time buyers will be required to pay stamp duty and land tax on all purchases of £300,000 or more.
If you are purchasing a second home, you will also be required to pay an additional 5% stamp duty and land tax.
 

BROADBAND & MOBILE PHONE COVERAGE
Broadband- To check the broadband coverage available in the area go to
https://checker.ofcom.org.uk/en-gb/broadband-coverage

Mobile Phone- To check mobile phone coverage in the area go to
https://checker.ofcom.org.uk/en-gb/mobile-coverage
 

Property Ref: 100138005191

Share:

Similar Properties

Kitchener Road, Ipswich, Suffolk, IP1

3 Bedroom End of Terrace House | Guide Price £180,000

NO ONWARD CHAIN - Ipswich & Suffolk are delighted to offer this single bay, end of terrace family home, located to the W...

Turnpike Court, Stowmarket

2 Bedroom Apartment | £180,000

Ipswich & Suffolk Estate Agents are pleased to offer for sale this 2 bedroom ground floor apartment situated within clos...

Anchor Street, Ipswich Suffolk

2 Bedroom Apartment | Guide Price £175,000

NO ONWARD CHAIN - An ideal opportunity to purchase this 4th floor apartment enjoying its own private balcony overlooking...

Bramford Road, Ipswich, Suffolk

3 Bedroom End of Terrace House | Guide Price £190,000

CHAIN FREE - A three double bedroom Edwardian attached home of larger proportions with garage and parking to the popular...

Richmond Road, Ipswich

2 Bedroom Semi-Detached House | Offers in excess of £190,000

A beautifully presented, larger two double bedroom semi-detached home located on a favourite road to the popular West of...

Waveney Road, Ipswich, Suffolk

3 Bedroom Terraced House | Offers in excess of £190,000

Ipswich & Suffolk Estate Agents are delighted to offer for sale this 3 bedroom family house with no onward chain.The pro...

Your Ipswich (Ipswich)

125 Dale Hall Lane, Ipswich, Suffolk, IP1 4LS

01473 289333

How much is your home worth?

Use our short form to request a valuation of your property.

Request a Valuation

Mortgage Calculator

Amount Borrowed: £
Total Amount Repayable: £
Total Monthly Payment: £
©2026 The Guild of Property Professionals. All rights reserved. Terms and Conditions | Privacy Policy | Cookie Policy | Complaints Policy | Members Login
The Guild of Property Professionals Trading Address: 121 Park Lane, London W1K 7AG. GPEA Limited. Registered in England & Wales.  Company No: 02819824.  Registered Office Address: The Old Courthouse, 60A London Road, Grantham, NG31 6HR.  VAT Registration No: 180897859
Book a Property Valuation Update Cookies Preferences