White's Way, Hedge End, SO30

£375,000
SSTC
This property listing is now SSTC

3 Bedroom End of Terrace House for sale in Southampton

2 3 2
  • THREE/FOUR BEDROOMS
  • KITCHEN/DINING/LIVING ROOM
  • GROUND FLOOR CLOAKROOM
  • SPACIOUS LOUNGE
  • EN-SUITE TO THE MASTER
  • LANDSCAPED REAR GARDEN
  • DRIVEWAY & TANDEM LENGTH GARAGE
  • FREEHOLD
  • EPC GRADE C
  • EASTLEIGH COUNCIL BAND C

INTRODUCTION

Offering beautifully presented accommodation throughout, this three/four bedroom family home benefits from a 35ft, tandem length garage, driveway parking and a landscaped rear garden.

The ground floor comprises an entrance hall, WC and an impressive, 28ft kitchen/dining/living room with French doors to the rear garden.

On the first floor there is a good-sized lounge/additional bedroom, a modern family bathroom and a double bedroom, whilst on the top floor there are two further double bedrooms, including the spacious master with an en-suite shower room.

LOCATION

The property is conveniently situated within walking distance of Hedge End’s train station and Dowd’s Farm Park, as well as close to local shops, schools and amenities, including Hedge End’s retail park and the M27 motorway links.

DIRECTIONS

Upon entering White’s Way from Tollbar Way, follow the road along proceeding straight ahead at the roundabout, where the property can be found a short way along on the left hand side.

GROUND FLOOR

The entrance hall has stairs to the first floor and doors through to the main living accommodation and the modern WC, which has a window to the front.

The wonderful, open plan kitchen/dining/living room has been fitted with a stylish range of high gloss wall and base units with a built-in double oven and gas hob with extractor over and integrated appliances including a fridge/freezer, dishwasher and washing machine. There is a useful breakfast bar, a large built-in storage cupboard and French doors, with full-length windows either side, opening out to the rear garden.

FIRST FLOOR

The generous size lounge has two windows facing the front of the property and could also be used as an additional bedroom if required. There is a spacious double bedroom which overlooks the rear garden and has an airing cupboard, as well as a modern family bathroom with a panel enclosed bath with shower and screen over, wash hand basin and WC.

SECOND FLOOR

The good-sized master bedroom has a built-in wardrobe and cupboard, a window to the front and a modern en-suite with a shower cubicle, wash hand basin and WC. The second bedroom is also a double room and overlooks the rear garden.

OUTSIDE

To the side there is driveway parking leading to the tandem length garage which measures 35ft in length and has a door leading out to the landscaped rear garden, which has been laid to artificial lawn with a paved seating area at end.

BROADBAND

Full fibre broadband is available with download speeds of up to 1600 Mbps and upload speeds of up to 115 Mbps. Information has been provided by the Openreach website.

SERVICES

Gas, water, electricity and mains drainage are connected. Please note that none of the services or appliances have been tested by White & Guard.

Important Information

  • This is a Freehold property.
  • This Council Tax band for this property is: C
  • EPC Rating is C

Property Ref: 1f92ea01-d723-4517-853f-c2f6950d9cfc

Share:

Similar Properties

Hobb Lane, Hedge End, SO30

2 Bedroom Detached Bungalow | £375,000

Offered with no forward chain, this two double bedroom bungalow benefits from an attractive rear garden, driveway parkin...

Botley Road, West End, SO30

3 Bedroom Apartment | Offers in excess of £375,000

This wonderful, Duplex penthouse apartment offers approx. 1848sqft of internal accommodation, with the impressive top fl...

White's Way, Hedge End, SO30

3 Bedroom Terraced House | Offers in excess of £375,000

This well-presented, three/four bedroom town house benefits from a southerly facing rear garden, a garage to the rear an...

Cliffe Avenue, Hamble, SO31

3 Bedroom Semi-Detached House | Offers in excess of £390,000

Offered with no forward chain, this well-presented, three bedroom family home has been refurbished throughout and benefi...

Downscroft Gardens, Hedge End, SO30

3 Bedroom Link Detached House | £390,000

Situated in a cul-de-sac position, this well-presented, three bedroom family home benefits from an attractive, rear gard...

Le Marechal Avenue, Bursledon, SO31

3 Bedroom Detached House | £400,000

This beautifully presented, three bedroom detached family home benefits from an attractive rear garden and driveway park...

White & Guard (Hedge End)

St John Centre, Hedge End, Hampshire, SO30 4QU

01489 779030

How much is your home worth?

Use our short form to request a valuation of your property.

Request a Valuation

Mortgage Calculator

Amount Borrowed: £
Total Amount Repayable: £
Total Monthly Payment: £
©2026 The Guild of Property Professionals. All rights reserved. Terms and Conditions | Privacy Policy | Cookie Policy | Complaints Policy | Members Login
The Guild of Property Professionals Trading Address: 121 Park Lane, London W1K 7AG. GPEA Limited. Registered in England & Wales.  Company No: 02819824.  Registered Office Address: 2 St. Stephen's Court, St. Stephen's Road, Bournemouth, Dorset, England, BH2 6LA.  VAT Registration No: 576 8795 61
Book a Property Valuation Update Cookies Preferences