- *** £11,000 DEPOSIT OR STAMP DUTY CONTRIBUTION ON THIS HOME***
- HIGH SPECIFICATION DETACHED NEW HOME SITUATED IN THIS SUPERB LOCATION, CLOSE TO BEAUTIFUL OPEN COUNTRYSIDE AND WITH GOOD ACCESS TO THE TOWN CENTRE AND RAILWAY STATION
- THREE DOUBLE BEDROOMS AND A VERSATILE FOURTH ROOM ON THE FIRST FLOOR
- STUNNING OPEN PLAN KITCHEN/DINING/LIVING AREA WITH BI FOLD FOORS OPENING ONTO THE GARDEN
- INTEGRATED APPLIANCES, SOLAR PANELS AND ELECTRIC CAR CHARGING POINT
- EN SUITE SHOWER ROOM, STORE ROOM AND A DOWNSTAIRS CLOAKROOM
- DRIVEWAY AND GARAGE
- NHBC 10 YEAR WARRANTY