Wicken Road, Arkesden

Guide Price
£875,000
SSTC
This property listing is now SSTC

4 Bedroom Detached House for sale in Saffron Walden

2 4 3
  • An immaculately presented, detached four bedroom, three bathroom residence
  • Grade II listed barn conversion with sympathetic, modern additions
  • Stunning in frame kitchen/breakfast room with bi-folding doors onto the garden
  • Underfloor heating throughout the ground floor
  • Versatile accommodation with annexe potential
  • Principal bedroom with ensuite wet room
  • Beautiful ground floor shower room and first floor bathroom
  • Private rear garden
  • Off road parking for multiple vehicles
  • Highly desirable village location

The Accommodation

The ground floor of May Barn is arranged to provide a versatile and well-considered flow of accommodation, combining characterful spaces with practical family living. The property is entered into a welcoming reception hall, from which the principal ground floor rooms are accessed. Positioned to the right, and the heart of the house, is the impressive kitchen/breakfast room, a sociable and light-filled space designed for modern living. The kitchen is arranged around a central island and opens naturally into the principal lounge/dining room, creating an excellent sense of scale and connectivity. The lounge/dining room is of notable proportions, lending itself comfortably to both relaxed seating and more formal dining, with doors opening to the outside, enhancing the connection between house and garden.

To the rear of the property lies a generous media room, an adaptable space well suited as a snug, or secondary sitting room, offering a degree of separation from the main living areas and a potential annexe if required. Adjacent is a utility room, thoughtfully positioned to serve the day-to-day requirements of the house, with space for appliances and ancillary storage, and convenient access to a ground floor shower room. A spiral staircase from the ground floor rises to the fourth bedroom.

The first-floor accommodation is arranged to provide comfortable and well-balanced bedroom space, ideal for family living and visiting guests. The principal bedroom suite is of generous proportions and enjoys a pleasant outlook, offering ample space. It is served by a superb en suite shower room, creating a private and practical retreat within the house. Two further bedrooms are positioned along the first floor, each offering flexibility for use as guest accommodation, children’s rooms or home office space. These rooms are served by a stunning family bathroom, thoughtfully arranged and centrally located for convenience.

Outside

To the front of the property, a private driveway provides off-road parking for three to four vehicles, offering a practical and valuable feature for a village home. The driveway sits comfortably within the setting of the barn and allows for easy day-to-day access.

To the rear lies a private garden, providing a peaceful outdoor space ideal for both relaxation and entertaining. The garden offers a good degree of privacy and is well suited to outdoor dining, family use or more informal enjoyment throughout the warmer months. The combination of generous parking and a private rear garden further enhances the appeal of the property, particularly for those seeking space and privacy within a well-regarded village location.

Important Information

  • This is a Freehold property.
  • This Council Tax band for this property is: F

Property Ref: 1309141

Share:

Similar Properties

Dewes Green Road, Berden

4 Bedroom Detached House | Guide Price £875,000

The PropertyThis exceptional property, thoughtfully arranged over three floors, masterfully combines traditional timber...

Langley Upper Green

4 Bedroom Detached House | Offers Over £850,000

An individual and bespoke, new home situated in the heart of the village with stunning views to adjoining countryside. T...

Whiteditch Lane, Newport

4 Bedroom Detached House | Offers Over £850,000

An individual four bedroom, two bathroom detached family home, occupying a good size plot, nestled away on the edge of t...

Golden Lane, Radwinter

5 Bedroom Detached House | Offers Over £895,000

A distinctive and beautifully proportioned country home set within glorious gardens of around half an acre.

Ivytodd Hill, Debden

5 Bedroom Detached House | Guide Price £895,000

This charming and versatile, Grade II listed, three bedroom, two-bathroom family residence offers a wealth of accommodat...

West Road, Saffron Walden

3 Bedroom Semi-Detached House | Guide Price £925,000

A handsome and substantial period home, 11 West Road offers an appealing combination of character, contemporary open-pla...

Arkwright & Co (Saffron Walden)

Saffron Walden, Essex, CB10 1ES

01799 668600

How much is your home worth?

Use our short form to request a valuation of your property.

Request a Valuation

Mortgage Calculator

Amount Borrowed: £
Total Amount Repayable: £
Total Monthly Payment: £
©2026 The Guild of Property Professionals. All rights reserved. Terms and Conditions | Privacy Policy | Cookie Policy | Complaints Policy | Members Login
The Guild of Property Professionals Trading Address: 121 Park Lane, London W1K 7AG. GPEA Limited. Registered in England & Wales.  Company No: 02819824.  Registered Office Address: The Old Courthouse, 60A London Road, Grantham, NG31 6HR.  VAT Registration No: 180897859
Book a Property Valuation Update Cookies Preferences