Mount Batten, Plymouth

£470,000

4 Bedroom House for sale in Plymouth

2 4 3
  • 3-storey property located in a private waterside development
  • Accommodation over 3 levels with flexible use
  • Open-plan kitchen/dining/living area on the ground floor
  • First floor living room with a kitchen area
  • 4 bedrooms
  • Master ensuite & 2 further shower rooms
  • 2 outside patio garden spaces
  • Residents' parking
  • Double-glazing & gas central heating
  • No onward chain

Most delightful property being sold with no onward chain located in the ever popular waterside development of Spinnaker Quay. The accommodation is laid out over 3 levels and is flexible in its use. It could be either arranged as one residence or split into 2 separate areas. The accommodation is currently set up with 4 bedrooms, master ensuite, additional ground floor shower room & top floor bathroom. There is a kitchen/dining/living area on the ground floor as well as a first floor kitchen/living area. It has the bonus of 2 outside patio garden areas together with residents' parking. The property benefits from double-glazing & gas-fired central heating.

Spinnaker Quay, Mount Batten, Pl9 9Sa -

Accommodation - Access to the property is gained via the covered entrance with a wooden entrance door leading into the entrance hall.

Entrance Hall - Tiled floor. 2 built-in storage cupboards, one of which extends beneath the stairs.

Shower Room - 1.95 x 1.35 at widest points (6'4" x 4'5" at wides - Comprising a corner shower cubicle with a shower unit with spray attachment, pedestal wash basin and a low level toilet. Vertical towel rail/radiator. Tiled floor. Fully-tiled walls.

Bedroom Four - 3.35 x 2.48 (10'11" x 8'1") - Double-glazed window to the front elevation.

Kitchen/Dining/Living Area - 9.98 x 5.65 at widest points (32'8" x 18'6" at wid - An irregular shaped room with a double-glazed window and French-style double doors providing a pleasant outlook and access onto the patio garden. Within the kitchen area there is a series of matching beech-effect eye-level and base units with granite work tops and splash-backs. Inset one-&-a-half bowl single drainer sink unit with mixer tap. 4-ring gas hob with an extractor hood above. Adjacent double electric oven. Built-in dishwasher. Built-in under-counter fridge and freezer. Integrated washing machine. Wall-mounted gas boiler. Built-in storage cupboard.

First Floor Landing - Providing access to the first floor accommodation. Stairs rising to the second floor. Built-in storage cupboard.

Bedroom One - 4.16 x 3.57 (13'7" x 11'8") - A dual aspect room with double-glazed windows to the front and side elevations with lovely views towards Mount Batten pier and across Plymouth Sound towards Drakes Island and Mount Edgecumbe in the distance. Double doors opening into a dressing area.

Dressing Area - 3.58 x 1.32 (11'8" x 4'3") - Range of shelving and hanging areas.

Ensuite Shower Room - 1.96 x 1.43 (6'5" x 4'8") - White modern suite comprising a corner shower cubicle with a shower unit with spray attachment, pedestal wash basin with a mixer tap and a low level toilet. Vertical towel rail/radiator.

Lounge/Kitchen Area - 5.64 x 3.47 (18'6" x 11'4") - A dual aspect room with full-length double-glazed windows to the side elevation as well as double-glazed doors providing a pleasant outlook and access onto the sun terrace. There is a lounge area as well as a modern kitchen area. Within the kitchen area there is a sink unit with a mixer tap and an under-counter fridge.

Second Floor Landing - Providing access to the second floor accommodation. A velux-style double-glazed window to the sloping ceiling to the rear elevation.

Bedroom Two - 4.12 x 3.57 (13'6" x 11'8") - Full-length double-glazed windows with a Juliette balcony overlooking the residents' courtyard. Built-in storage including hanging rails.

Bedroom Three - 4.12 x 3.62 (13'6" x 11'10") - Full-length double-glazed windows with a Juliette balcony with an outlook across towards the Mount Batten watersports activity centre and views towards Plymouth Sound and Staddon Heights in the distance. Built-in storage with hanging space.

Bathroom - 1.92 x 1.68 (6'3" x 5'6") - Comprising a bath with mixer tap, tiled area surround, shower unit, spray attachment and shower screen, pedestal wash basin with mixer tap and a low level toilet. Vertical towel rail/radiator. Fully-tiled walls.

Outside - The property is accessed via the private gated entrance with off-road parking in front of the property and a built-in storage area adjacent to the front entrance. There is a lovely sun terrace which is laid to patio leading from the first floor living room and also a patio garden accessed from the ground floor kitchen/dining/living room. This area is enclosed by high walling and fencing. There is a raised planted border and a storage shed.

Council Tax - Plymouth City Council
Council tax band E

Services - The property is connected to all the mains services: gas, electricity, water and drainage.

Property Ref: 34161292

Share:

Similar Properties

Elburton, Plymouth

3 Bedroom Barn Conversion | £465,000

Superbly-crafted barn conversion situated in this highly popular position close to Elburton Village. The accommodation i...

Plymstock, Plymouth

3 Bedroom Detached Bungalow | £465,000

Superbly-presented detached bungalow in a lovely position with a west-facing garden & fantastic views. The accommodation...

Dunstone, Plymouth

2 Bedroom Detached Bungalow | £460,000

Beautifully-presented detached bungalow situated within this highly sought-after hamlet, nestled in the South Hams count...

Sherford, Plymouth

5 Bedroom Detached House | £475,000

Detached house in a lovely position within Sherford with views over the park towards woodland. The accommodation is arra...

Wembury, Plymouth

3 Bedroom Detached Bungalow | £475,000

Detached bungalow set in a generous secluded plot in the heart of Wembury village, offering excellent potential with lov...

Down Thomas, Plymouth

4 Bedroom Detached House | £485,000

Wonderful detached residence located in the ever popular South Hams village of Down Thomas. It enjoys a private position...

Julian Marks Estate Agents (Plymstock)

2 The Broadway, Plymstock, Plymstock, Devon, PL9 7AW

01752 401128

How much is your home worth?

Use our short form to request a valuation of your property.

Request a Valuation

Mortgage Calculator

Amount Borrowed: £
Total Amount Repayable: £
Total Monthly Payment: £
©2026 The Guild of Property Professionals. All rights reserved. Terms and Conditions | Privacy Policy | Cookie Policy | Complaints Policy | Members Login
The Guild of Property Professionals Trading Address: 121 Park Lane, London W1K 7AG. GPEA Limited. Registered in England & Wales.  Company No: 02819824.  Registered Office Address: The Old Courthouse, 60A London Road, Grantham, NG31 6HR.  VAT Registration No: 180897859
Book a Property Valuation Update Cookies Preferences